Data Summary
Location:
Project type:
Client:
Construction Cost:
Length:
Other Consultants:
Scope:
Current Status:
Straits of Melaka
Physical Project
Masers Energy Inc (USA)
45 billion (RM) total project cost
109.4km total (48.8km on water)
Deloitte (Financial)
Full Scope / Advisory
Design Development
Interconnecting two nations together
Project Abstract
[SA]² was brought in to the picture to resolve the issue that was plaguing the government project where by there were few issues with regard to design and methodology of the bridge operation. One of the prime concern whcih was the safety issues which lead to the creation of an intermediate out post in the middle of the bridge to cater for all emergencies and arising issues. I was only logical to