Melaka-Dumai Bridge

Data Summary

 

Location:

Project type: 

Client: 

Construction Cost:

Length: 

Other Consultants:

Scope:

Current Status:

 

 

 

 

 

 

Straits of Melaka

Physical Project

Masers Energy Inc (USA)

45 billion (RM) total project cost

109.4km total (48.8km on water)

Deloitte (Financial)

Full Scope / Advisory

Design Development

 

Interconnecting two nations together

MDB icon

Project Abstract

 

[SA]² was brought in to the picture to resolve the issue that was plaguing the government project where by there were few issues with regard to design and methodology of the bridge operation. One of the prime concern whcih was the safety issues which lead to the creation of an intermediate out post in the middle of the bridge to cater for all emergencies and arising issues. I was only logical to 

 

 

 

 